DIY sewage system

Is it realistic to make a sewer in a country house with your own hands for a person, without any special skills, ”this event only seems difficult, in fact it is quite possible for everyone. This article will help to understand the key features of the installation of the sewage system. Of course, you can order all this in a turnkey profile companies, or make a sewer pumping station from Armatekh for several sites. At the moment, there are four options for the sewage device: – the cesspool is perhaps the oldest and most impractical option, known to everyone, so its advantages and disadvantages will not be listed, will not be. – Sewerase consisting of concrete overflowing wells – this option is quite difficult to implement, since you will have to carry out a large amount of earthwork during the device. And in the future, a systematic challenge of the Assenization machine and the implementation of its unhindered passage will be needed. – A septic tank of plastic or fiberglass – the installation of such a system is carried out using filtration fields, clogging over time and beginners spread an unpleasant odor. In this case, you will have to turn again for the help of the assignment machine. – Deep biological cleaning station – perhaps the best choice. The system is convenient in installation. There are two types of stations depending on the location of groundwater and soil water permeability: drainage of purified water by gravity, in the case of low groundwater falling, and forced drainage of water with a high location of groundwater. The installation procedure for the sewage system – work on the installation of the station begin with digging a pit. The minimum dimensions of the station will be 1.5-1.5-2.3 m. The location of the station must be selected so that the reception pipe enters it as directly, without unnecessary turns. – The station is lowered into a dug pit. It is necessary to align the station by level, pour it with water (to special internal tags) and at the same time spilled with sand. Sprinking sand must be for its compaction. – trenches for pipelines (drain and water supply) are born). The diameter of the water supply is about 110 mm, the removal of the pipe is 50-100 mm. It is necessary to withstand the slope of the supply pipelines in 2 %. Holes are drilled in the station and pipelines are soldered in them. Water output is carried out through a standard hole. If necessary, you can drill a hole for a hose with a diameter of 32 mm. – Connection to power supply. To connect the station, a PVS cable is recommended, which fits into a trench in a plastic pipe. The electricity consumption of the station in working mode will be only about 1.4 kW.

Related posts

Elements of overhead costs

wallspapers

Repair of shower pallets Restoration of acrylic

wallspapers

strength lightness and reliability

wallspapers